The tunnel longitudinal profile, together with the topographic plan, is a required product for topographic control in underground projects. For this purpose, it is necessary to use Tunnel Corridor tools, Tunnel Template configuration, Road Corridor, Road Template configuration, work with Surfaces, with Laser Scanner data, and drawing of the survey from a point cloud.
TOOLS USED
Import Tunnel TXL Project | 00:56
Create designed tunnel mesh | 01:21
Create horizontal alignment labels | 01:53
Import E57 Point Cloud | 03:16
Assign final execution points to the tunnel | 04:21
Sample point cloud region | 06:54
Create surface | 07:24
Create corridor | 09:21
Create line string | 10:35
Import VCL template | 12:26
Print plan set | 17:24